Поддержание inverted bridge formwork is crucial for safety and for ensuring the quality of the concrete structure. This involves a systematic approach that includes regular inspection, proper cleaning, and correct storage and handling.

Inverted Bridge Formwork Maintenance

inverted bridge formwork

1. Дизайн и планирование:

Detailed Drawings: До начала, have detailed drawings that show the formwork’s dimensions, материалы, support system, and assembly sequence.

Выбор материала: Choose high-quality, durable materials suitable for the expected loads and environmental conditions.

Load Calculations: Accurately calculate all potential loads, including the weight of wet concrete, rebar, workers, и оборудование, to ensure the formwork can safely support them.

Safety Factors: Incorporate appropriate safety factors into your design to account for unforeseen circumstances.

2. Pre-Assembly and Inspection:

Pre-fabrication: Whenever possible, pre-fabricate large sections of the formwork on the ground. This allows for better quality control and faster, safer installation.

Component Inspection: Before assembly, thoroughly inspect all formwork components for damage, дефекты, or wear. Replace any faulty parts.

Уборка: Ensure all surfaces that will be in contact with concrete are clean and free of debris, ржавчина, or old concrete.

3. Erection and Installation:

Level and Plumb: Erect the formwork accurately, ensuring it is level, plumb, and true to the specified dimensions and alignment.

Secure Connections: All connections, including bolts, зажимы, and ties, must be securely fastened to prevent movement or displacement during concrete pouring.

Proper Shoring and Bracing: Install an adequate amount of shoring and bracing to support the formwork’s weight and the concrete’s pressure. The supports should be evenly distributed and firmly seated.

Access and Working Platforms: Provide safe access points and stable working platforms for workers to install rebar, конкретный, and inspect the formwork.

inverted bridge formwork

4. During Concrete Pouring:

Monitor and Inspect: Continuously monitor the formwork during concrete placement for any signs of deflection, bulging, or leakage.

Controlled Pouring: Pour concrete in a controlled manner, at a rate that doesn’t overload the formwork. Avoid dropping concrete from excessive heights, which can cause impact loads.

For more detailed information on how to maintain the inverted bridge formwork, пожалуйста, нажмите здесь: https://www.gf-bridge-tunnel.com/a/blog/inverted-bridge-formwork-maintenance.html