JULI TECHNOLOGY INDUSTRIAL PARK Phase I & II is a large-scale industrial steel structure project adopting a standard portal frame structure system. The project features a huge building area, tight construction schedule, and strict international quality standards. Through refined overall planning, full-process construction control and professional technical optimization, the project successfully passed high-level quality acceptance with excellent overall performance. Especially the сelf-developed roof enclosure system achieved zero leakage throughout the service period, solving the most common pain point of industrial factory buildings and delivering a high-quality, durable and safe steel structure industrial park for the client.
- Total Building Area: 170,000 ㎡
- Total Steel Consumption: 9,180 Tons

The portal frame steel structure applied in this project is widely recognized for its large span, high space utilization, lightweight and high strength. It perfectly meets the functional demands of modern industrial parks such as large-area open space, equipment placement and production operation.
Facing the dual requirements of compact construction period and high-quality standards, our team adopted standardized prefabricated steel structure construction mode. Strict control was implemented in steel processing, on-site installation, precision calibration and enclosure construction. Scientific schedule arrangement and refined quality management effectively shortened the construction cycle while ensuring every construction detail complies with international industrial building specifications.
…
For more detailed information about the Phase I and II of the Science and Technology Industrial Park | High-Standard Portal Frame Steel Structure Project, пожалуйста, нажмите, чтобы посетить: https://www.hcggsteel.com/a/news/high-standard-portal-frame-steel-structure-project.html


